Floors & access routes
Mats for the areas your crew will use, with coverage planned around the rooms and floors being prepped.
LOCATION SUPPORT / TORONTO
Prepare the location before the crew arrives. Floor, stair and surface protection, with prep and wrap support built around your production.
Request a prep quote Explore the prep work Choose Light or Heavy Prep. NTB reviews your request and prepares a quote.
PREP / PROTECT / WRAP
Let us know which areas are in use, what needs covering and when the location needs to be ready.
Mats for the areas your crew will use, with coverage planned around the rooms and floors being prepped.
Protection suited to carpeted or hard-surface stairs, plus corrugated protection for selected walls and furniture.
Bubble-wrap protection for the glass items and railings included in your location prep.
A LOCATION BECOMES A SET
A photo walkthrough of real NTB prep work, from the routes crews use to the surfaces that need extra care.
THE WORK / UP CLOSE
Explore mat routes, wrapped railings, protected stairs and carefully covered surfaces. Select a photograph to see the full view.
Selected location prep work · Select a photograph to view the full image.
Mats define the route through the hallway, with corrugated protection along the walls.
A mat route follows the rooms and passages being used by the production.
Floor mats and corrugated panels around the working areas of a room.
Protection laid through the entry and adjoining living space.
Protective film over the stairs, with bubble wrap around the railings and adjacent surfaces.
A closer look at stair covering and wrapped railings at a landing.
Protective film follows the outdoor steps used to reach the location.
Mats on the landing, corrugated wall panels and a wrapped railing.
Corrugated protection along the lower walls and stonework of a corridor.
Bubble-wrap protection applied across the lower window area.
Corrugated panels fitted around wall edges, trim and changes in direction.
Protected wall edges and a mat route through a narrow doorway.
FROM FIRST INQUIRY TO FINAL WRAP
Every house is different. Start with the areas your production will use, then confirm a prep and wrap plan with NTB.
Start your location prep inquiryShare your production, address, prep and wrap dates, and choose Light Prep or Heavy Prep. Extra location details are optional.
NTB reviews the request, confirms the areas and access, and prepares a quote or price list explaining the rates and how the work will be billed.
The agreed areas are prepared for filming, from mat routes through the house to stair, wall and surface protection.
Keep NTB informed if the rooms in use, access needs or filming schedule change, so any adjustments can be reviewed.
After filming, NTB returns at the agreed wrap time to collect the protection materials and review any final job adjustments.
YOUR LOCATION / OUR STARTING POINT
Share your production details, dates and prep level. Square footage, floors and stairs are optional planning details. NTB reviews the request and prepares your quote with rates and billing information. Final charges reflect actual labour and materials used.